Science & Technology
Space and Defence Technology
Space and Defence Technology — Quick Revision
One-page CGPSC quick revision for Space and Defence Technology: launch vehicles, satellites, missions, missiles and defence platforms with dates (as of 2026).
ISRO, satellites, missions, missiles and defence platforms on one page. Statuses are as of early October 2026. For explanations, go back to the chapter.
How to use this sheet
Scan it top to bottom in the week before Prelims. Bold entries are the facts examiners return to most often. Re-check every “planned” or “targeted” line against the latest news before the exam.
Space Programme Timeline
| Year | Event |
|---|---|
| 1962 | INCOSPAR (Vikram Sarabhai), under DAE |
| 1963 | First sounding rocket (Nike-Apache), Thumba, 21 Nov |
| 1969 | ISRO formed, 15 Aug |
| 1972 | Space Commission and Department of Space |
| 1975 | Aryabhata — first satellite (Soviet launch), 19 Apr |
| 1980 | SLV-3 / Rohini — first Indian launch to orbit, 18 Jul (Kalam) |
| 1982–83 | INSAT system begins |
| 1984 | Rakesh Sharma in space (Soyuz T-11), 3 Apr |
| 1988 | IRS-1A, first remote-sensing satellite |
| 1994 | First successful PSLV |
| 2008 | Chandrayaan-1 |
| 2014 | GSLV-D5: indigenous cryogenic stage (Jan); Mangalyaan in Mars orbit (24 Sep) |
| 2017 | PSLV-C37: 104 satellites (15 Feb) |
| 2019 / 2020 | NSIL / IN-SPACe |
| 2023 | Chandrayaan-3 lands 23 Aug; Aditya-L1 launched 2 Sep; Space Policy (Apr) |
| 2024 | XPoSat (1 Jan); Aditya-L1 at L1 (6 Jan); FDI reform (Feb); SpaDeX launched (30 Dec) |
| 2025 | SpaDeX docks 16 Jan; NVS-02 orbit failure; PSLV-C61 fails (May); Shukla on ISS (Ax-4, Jun–Jul); NISAR launched 30 Jul; LVM3-M6 heaviest payload (24 Dec) |
| 2026 | PSLV-C62 fails (12 Jan); Skyroot Vikram-1 — first private orbital launch (18 Jul); GSLV-F17/EOS-05 (4 Sep); NVS-03 targeted Oct; Gaganyaan G1 targeted by end-2026 |
Launch Vehicles
| Vehicle | Key fact |
|---|---|
| PSLV | Solid–liquid–solid–liquid; polar orbits; Chandrayaan-1, MOM, Aditya-L1, XPoSat, SpaDeX |
| GSLV | Indigenous cryogenic upper stage; NavIC NVS; NISAR (first GSLV to SSO) |
| LVM3 | Heaviest; CE-20 cryogenic engine; Chandrayaan-2/3; commercial (OneWeb, BlueBird); human-rated for Gaganyaan |
| SSLV | Small satellites, ~500 kg to LEO |
| NGLV | Partly reusable, approved Sep 2024 |
| Spaceports | Sriharikota (third pad approved Jan 2025); Kulasekarapattinam (TN, for SSLV) |
Satellites
| Satellite / system | Key fact |
|---|---|
| INSAT / GSAT | Communication (+ weather on INSAT); GEO |
| INSAT-3D / 3DR / 3DS | Meteorology; 3DS Feb 2024 |
| Cartosat / Resourcesat / Oceansat | Mapping / resources / oceans (polar orbit) |
| RISAT, EOS-04 | Radar — through clouds, day and night |
| NISAR | NASA (L-band) + ISRO (S-band); 12 m antenna; 12-day global coverage |
| NavIC | 7 satellites (3 GEO + 4 GSO); India + ~1,500 km; NVS series adds L1 and indigenous clocks |
| GAGAN | ISRO + AAI; augments GPS for aviation (not independent) |
| GSAT-7 / 7A | Navy (“Rukmini”) / Air Force |
| Bhuvan | ISRO geoportal (NRSC, Hyderabad) |
Exploration and Human Spaceflight
| Mission | Key fact |
|---|---|
| Chandrayaan-1 | 2008; water/hydroxyl evidence; impact probe |
| Chandrayaan-2 | 2019; lander crashed; orbiter working |
| Chandrayaan-3 | Landed 23 Aug 2023, ~69° S; 4th country to soft-land, 1st near south pole; Shiv Shakti Point; sulphur confirmed |
| Chandrayaan-4 | Sample return; approved Sep 2024; target 2027 |
| Chandrayaan-5 / LUPEX | With JAXA; arrangement signed 29 Aug 2025 |
| Mangalyaan | First Asian nation to Mars orbit; first-attempt success (2014) |
| AstroSat | 2015; first multi-wavelength observatory |
| Aditya-L1 | Sun; halo orbit at L1 (~1.5 million km from Earth); VELC |
| XPoSat | X-ray polarimetry (2024) |
| SpaDeX | Docking 16 Jan 2025 — 4th country |
| Venus Orbiter | Approved Sep 2024; ~2028 |
| Gaganyaan | 3 crew, ~400 km, 3 days; HLVM3; Vyommitra robot; G1 uncrewed not yet flown (as of Oct 2026) |
| Astronaut-designates | Nair, Ajit Krishnan, Angad Pratap, Shubhanshu Shukla |
| Ax-4 | Shukla — first Indian on the ISS (25 Jun–15 Jul 2025) |
| BAS | BAS-1 module 2028; full station 2035; Indian on Moon 2040 (vision) |
Missiles and Strategic Systems
| Item | Key fact |
|---|---|
| IGMDP | 1983, Kalam: Prithvi, Agni, Trishul, Nag, Akash (PATNA) |
| Agni-V | 5,000 km+; first test 2012 |
| Mission Divyastra | Agni-V MIRV, 11 Mar 2024; another advanced Agni MIRV test 8 May 2026 |
| Agni-Prime | Canisterised; rail-launcher test Sep 2025 |
| BrahMos | India–Russia supersonic cruise; Brahmaputra + Moskva; Philippines first export |
| Nirbhay / Pralay / Astra / Rudram | Subsonic cruise / quasi-ballistic SRBM / BVR air-to-air / anti-radiation |
| LRHM | Hypersonic, 16 Nov 2024, >1,500 km |
| Mission Shakti | ASAT, 27 Mar 2019, Microsat-R in LEO; 4th country |
| BMD | PAD (exo-atmospheric) + AAD (endo-atmospheric) |
| S-400 | Russian; IAF name “Sudarshan Chakra” |
| Mission Sudarshan Chakra | Announced 15 Aug 2025; national shield by 2035 |
| Pokhran | I: 18 May 1974; II: 11 and 13 May 1998 (National Technology Day 11 May) |
| Doctrine (2003) | Credible minimum deterrence; No First Use; NCA — Political Council (PM), Executive Council (NSA) |
| SSBNs | Arihant (2016; triad operational Nov 2018), Arighaat (Aug 2024), Aridhaman (3 Apr 2026) |
| Regimes | MTCR 2016, Wassenaar 2017, Australia Group 2018; not NSG; NPT/CTBT not signed |
Defence Technology
| Item | Key fact |
|---|---|
| DRDO | 1958 |
| CDS | From 1 Jan 2020 (Gen Bipin Rawat first) |
| OFB | Corporatised into 7 DPSUs, 1 Oct 2021 |
| Tejas | ADA design, HAL build; US GE engine |
| INS Vikrant | First indigenous carrier; Cochin Shipyard; 2 Sep 2022 |
| Kalvari class | 6 Scorpene submarines; last, Vaghsheer, 15 Jan 2025 |
| iDEX / Corridors | 2018 / UP (6 nodes) and Tamil Nadu (5 nodes) |
| DAP 2020 | “Buy (Indian-IDDM)” first |
| FDI | 74% automatic (2020) |
| Exports | ₹38,424 crore, FY 2025-26 (record); target ₹50,000 crore by 2029 |
| Operation Sindoor | 7 May 2025; cessation 10 May 2025 |
| CG angle | Bhilai Steel Plant — DMR-grade warship steel for INS Vikrant; CCOST satellite rice estimates |
Don’t Confuse
| This | vs | That |
|---|---|---|
| Aryabhata (1975, Soviet launch) | vs | Rohini (1980, SLV-3) |
| NSIL (commercial company) | vs | IN-SPACe (authoriser/regulator) |
| NavIC (independent, regional) | vs | GAGAN (GPS augmentation) |
| Shiv Shakti Point (C-3 landing) | vs | Tiranga Point (C-2 crash) |
| Rakesh Sharma (1984, Soyuz) | vs | Shubhanshu Shukla (2025, Ax-4 to ISS) |
| Mission Shakti (2019, ASAT) | vs | Operation Shakti (1998, Pokhran-II) |
| Ballistic (Agni) | vs | Cruise (BrahMos) |
| Kalvari (diesel-electric) | vs | Arihant (nuclear SSBN) |
| INS Vikrant (indigenous, 2022) | vs | INS Vikramaditya (ex-Russian, 2013) |
Favourite MCQ traps
- PSLV has no cryogenic stage.
- NavIC is regional, not global; GAGAN does not replace GPS.
- Chandrayaan-3 had no orbiter of its own and returned no samples.
- Gaganyaan’s crewed flight had not happened as of 2026 — Shukla flew on Axiom-4.
- Trishul was surface-to-air; Nag is anti-tank.
- India is not in the NSG.
Advertisement